Recording Studios

Royal Academy of Music London

The Problem: 

Inadequate acoustic doors and housing causing problems for production.

The Solution: 

Increase density of single leaf wall with double soundbloc board and isolated perimeter. Replace wooden doors with 'slow shut' 48db steel Strongdoors and sealed plate footings with new concrete plinths.

The Result: 

Studio acoustic integrity re instated and therefore usable for recording purposes.